EXPERT ADVICE. CLEAR NEXT STEPS.
office@onor.ie01 531 0287
Home / Snag lists
SNAGGING & RE-SNAG INSPECTIONS

The finishing details.
Checked before handover.

A photographic snag list documents visible defects and unfinished work. An additional re-snag visit checks the original items after the builder has carried out remedial works.

Request a snagging quote New houses & apartments · Photographic snag lists · Optional re-snag
TWO STAGES. A CLEARER PICTURE.

First, identify the snags.
Then, check what’s been addressed.

From the first inspection to a follow-up review, we help you keep track of the visible issues that need attention before handover.

01INITIAL SNAG INSPECTION

A snag list your builder can work through.

We inspect the agreed accessible areas and record visible defects, incomplete finishes and workmanship concerns, with photographs and practical descriptions of the items needing attention.

  • Visible items recorded with their location
  • Photographs to help explain the concern
  • A written report to share with your builder
Arrange your initial snag
02ADDITIONAL RE-SNAG VISIT

Follow up on the original findings.

Once your builder confirms the remedial work is ready, we can return to review the original snag list. The follow-up records which accessible items have been addressed and which still need attention.

  • Original snag items reviewed on site
  • “Done” and “Not Done” markings for original items
  • Outstanding items identified for further action

A re-snag is an additional inspection, quoted and booked separately.

Ask about a re-snag
DETAILS THAT DESERVE ATTENTION

More than a coat of paint.

Your snag list can cover a range of visible issues, from the quality of finishes to concerns that need further attention from the builder or a relevant specialist. The scope depends on the property and access agreed.

Finishes & workmanship

Paint, plaster, skirting, tiling, sealants, joinery and incomplete or damaged finishes.

Doors, windows & fittings

Visible gaps, catches, handles, hinges, seals, kitchen units and fitted storage.

External areas

Accessible brickwork, sills, vents, external finishes, balconies and visible drainage concerns within the agreed scope.

Visible installation concerns

Exposed or unfinished pipework, cabling and ventilation details that need attention or clarification by the relevant contractor.

Snagging is a visual inspection of accessible areas. It does not include specialist testing of electrical, heating, plumbing or ventilation systems, or certification of planning, building regulations or fire safety compliance.

EASY TO SHARE. EASY TO FOLLOW UP.

A photographic record.
A practical way forward.

Your initial report pairs photographs with descriptions so your builder can locate and understand the items raised. At a separately arranged re-snag, the original findings become the reference for checking progress.

Where an item remains unfinished, inaccessible or needs further clarification, that should remain visible in the follow-up rather than being assumed resolved.

Discuss your property
ILLUSTRATIVE FOLLOW-UP

From findings to follow-through.

✓ Done

Previously noted paintwork made good.

× Not done

Window adjustment still requires attention.

✓ Done

Construction residue removed from brickwork.

Illustrative examples of status reporting. Findings are specific to each property and visit.

FROM FIRST VISIT TO FOLLOW-UP

A straightforward path
through your snag list.

01

Arrange the inspection

Share the address, property type and builder’s proposed access date. We confirm scope and a quote.

02

Receive your snag list

We inspect the accessible areas and issue your photographic report of visible findings.

03

Builder addresses the items

Share the report with your builder and ask them to confirm when the remedial works are ready for review.

04

Add a re-snag visit

If you book the additional inspection, we revisit the original items and record what is done and what remains outstanding.

BEFORE YOU BOOK

Your snagging questions, answered.

First inspections, follow-up visits and the details that matter.

When should I arrange my initial snag?

Contact us when your builder can confirm the home is ready for inspection and safe access can be arranged, ideally with time for remedial works and a follow-up before handover.

Do you snag houses and apartments?

Yes. We agree the relevant areas and access arrangements before booking. For apartments, balconies, shared areas and external elements are included only where agreed and accessible.

What will I receive?

A written photographic report identifying visible snag items and describing the work or clarification required. You can share it with your builder to help organise their response.

Is a re-snag included in the first inspection?

No. A re-snag is an additional visit, with a separate quote and booking. It is arranged after the builder has had the opportunity to address the initial report.

What happens during a re-snag?

We use the original snag list to review the accessible items and record whether they have been addressed. The follow-up marks items “Done” or “Not Done” so you can see what still needs attention.

Does a re-snag guarantee everything is fixed?

It records the visible condition of the original items at the follow-up visit. Concealed work, inaccessible items and specialist system performance cannot be confirmed through a visual check alone. Outstanding items may require further work or another separately arranged visit.

Do you test systems or certify compliance?

The inspection does not include specialist system testing or certification of compliance. Visible installation concerns may be noted for the builder or relevant contractor to investigate, but this does not replace their testing, commissioning or certification.

How much do snagging and re-snagging cost?

Send the property details and tell us whether you need an initial snag, a follow-up or quotes for both. We confirm the scope and fee before each inspection.

LET’S GET THE DETAILS RIGHT

A new home.
A clearer handover.

Send the address or Eircode, whether it is a house or apartment, and the proposed inspection date. Tell us if you would like an initial snag, an additional re-snag or a quote for both stages.

Request your tailored quote Or call 01 531 0287

Ready for a follow-up?

Ask your builder to confirm the original items have been addressed, then contact us to arrange the additional re-snag visit.

If the original report was prepared by someone else, send it with your enquiry so we can confirm whether a follow-up is appropriate.

Meet the directors behind ONOR. Claire O’Neill and Caoláinn O’Reilly lead the practice across engineering, surveying and residential design. Meet the directors

Tell us about your property.

Tell us about your property. We’ll help you choose the right service.

Request a quote
SURVEYS & REPORTSCheck next availability